January 28, 2008
Tomorrow the plan is to lay the subfloor,
so my next photos will show the ultimate view...hopefully of the Gulf !
Well , it turned out to be a beautiful
day couple days later, Sat. Feb. 2. 
|

Long G-P engineered floor joists from Swift
Supply for the second (top) floor.
|

The interior of the garage just before the
top floor decking went on.
|
Decking was passed in the front
door opening and up to the crew on the second floor. |

|
|

|

Temporary stairs were built inside from first
floor to the second floor. The actual stairs will have a landing
and extend out into the foyer a bit further.
|
 |
Looking north from the top floor.
The living room, kitchen and master bedroom are on this floor.
It will be the primary floor for living. |
 |

The position of the interior walls were
chalked off to assist with block placement. One must consider
where one's grout lines fall so you have max strength in your
wall to bolt the interior structures to. |
|

This will be the view from the top floor.
Another porch will go on top of the lower porch that you see
below.
|
Two rows of blocks have been
stacked for the front staircase. |
|

Blocks are in
place for rapid Dac-Art block stacking next week. Our decorative
panels for the second floor may be delivered next week too. That
will be quite exciting. Dac-Art can be created with elaborately
detailed faces to add a real old world elegance to your project. |