January 28, 2008
|
|
|
|
 |
The concrete stained row acid of
blocks called the frieze is being placed on the west side now.
The colors are subtle and really look good with the style and
color of the house. These blocks have been thru a couple of good
rains, so the colors we see will be the permanent ones. |
|

|

|
 |

|
|

|
We are up working on the top floor
now and the weather has been glorious. The house is very visible
from the road now and we know that thee is a high level of
interest in the Villa Lagoon Project by the number of people who
have stopped by and the rate at which the informational
tri-folds fly out of the box on the driveway.
This is what green housing for a
hurricane zone looks like. |
We
will be using Onsia concealed stereo speakers in our upper
floor. These cool speakers mount under the surface of the wall
so you totally do not see them. We will be using Onsia ceiling
speakers and also a very clever In-Frame model that can be
installed behind artwork...maybe even a Shrimp Festival poster. Onsia works on the principle of radiating sound through vibration. Our speaker panel creates hundreds of simultaneous, nonlinear vibrations instead of the piston-generated, directional pulses from conventional cone diaphragms. |
|
|